Client: NHDOT
Construction Cost: $2.4 Million
Key Facts:
GM2 developed an approach and schedule to meet the quick demands associated with the design-build procurement. The 135-foot span replacement structure utilized AASHTO LRFD design specifications, including heavy riprap to protect the bridge from future flood damage. GM2’s services included roadway design, hydraulics and scour mitigation.
Awards:
ACEC Engineering Excellence Award