Client: Manchester-Boston Regional Airport
Key Facts:
GM2 provided existing conditions plans at contours ranging from 0.2’ – 1’ contour intervals in winter conditions for numerous airport rehabilitation projects. Work was successfully coordinated and submitted within 45-60 days from Notice to Proceed. For the Runway 24 Control project GM2 re-set the threshold pin and both FAA reference stations that were destroyed during the resurfacing of Runway 24.