Client: McFarland Johnson
Construction Cost: $40k
Key Facts:
Runway and Disposal Area Survey (Rehabilitation Project)
(pictured above) GM2 was contracted by the City’s airport consultant to provided existing conditions and topographic survey of Runway 25-7, Taxiway B, and proposed disposal areas totaling more than 50 acres. Included in this survey was the detail and topography of a failing wooden slope adjacent to the airfield. Close coordination with ground personnel and control was required. This project funded by State and Federal resources was project critical and was completed within 30 days of notice to proceed, during winter conditions.
Airport Maintenance Facility Expansion
(pictured second) GM2 was contracted by the City’s airport consultant to provide boundary delineation, existing conditions plans, Lebanon Airport utility locations, and topography for the design development of the expansion of an existing maintenance structure at the airport funded by the FAA.