LEB Airport Runway And Disposal Area Survey

Client: Lebanon Municipal Airport

Key Facts:

  • Existing Conditions Survey
  • Topographic Survey

GM2 was contracted by the City’s airport consultant to provide existing conditions and topographic survey of Runway 25-7, Taxiway B, and proposed disposal areas totaling more than 50 acres. Close coordination with ground personnel and control was required. This project was funded by State and Federal resources and was completed within 30 days of notice to proceed, during winter conditions.