Client: RIDOT
Construction Cost: $8 Million
Key Facts:
GM2 is serving as the lead design firm under a Design-Build contract with RIDOT for the replacement of Bridge No. 653 carrying 9 lanes of I-95 over Oxford Street in Providence. The scope of work entails replacement of the bridge superstructure using Accelerated Bridge Construction techniques and rehabilitation of the existing abutment. With a high traffic volume and substantial site constraints the maintenance and protection of traffic is a critical factor.
Awards:
CSCE 2020 ACE Merit Award Recipient
3rd Place 2020 ACEC-RI Award for Projects under $10M