Client: CTDOT
Construction Cost: $100-150 Million
Key Facts:
GM2 is a key member of a consultant team retained by CTDOT to provide an in-depth needs and deficiencies study, alternatives analysis, NEPA/CEPA documentation, and Preliminary and Final Design for the reconfiguration of the I-91, I-691 and Route 15 Interchange in Meriden.
GM2 systematically identified and analyzed the existing operational and safety problems; led the development of four major full-build design alternatives with variations within each; and developed a set of smaller, incremental improvement alternatives to provide CTDOT with the option to implement independent improvements over a longer period of time.