Client: CTDOT
Construction Cost: $8 Million
Key Facts:
GM2’s solution to Bridge No. 03094’s extensive beam end deterioration entailed the construction of 4 simple spans with a steel girder superstructure and the use of, the first of its kind, Ultra-High Performance Concrete (UHPC) to encase the deteriorated beam ends. Bridge No. 03094 has an overall length of 273FT, a curb-to-curb width of approximately 131FT, and an ADT of 133,900. Extensive coordination with Amtrak and the maintenance and protection of traffic was critical to this project’s success.
Awards:
2021 CSCE ACE Award for Excellence with Innovation Technologies