Client: CTDOT
Construction Cost: $460,000
Key Facts:
GM2, as a subconsultant, provided routine and in-depth inspections of cantilever, full span and structure mounted over head sign supports and traffic signal mast arms. The scope of work included vendor coordination, work zone traffic control, creation of inspection reports, preparation of maintenance memorandums, performing minor maintenance to sign supports, and various non-destructive testing such as dye-pen for welds and UT for anchor bolts.