Eversource Line 1211 Reconstruction

Client: Eversource

Key Facts:

  • 3.5 Mile Line Section
  • 44 Line Structures Replaced

GM2 provided construction staking and FAA as-builts for the reconstruction of Line 1211 in Pittsfield, Massachusetts. This portion of the line is 3.5 miles in length. Each of the 44 structures being replaced required a design location laid out prior to construction. Post construction GM2 provided detailed as-built data for the entire corridor, including the location of all structures within the right-of-way.